대표 프로젝트

국내 프로젝트신세종 복합발전소 Project (2024)

Water Treatment System , CTBD Reclamation System, Waste Water Treatment System, Sewage Water Treatment System

발주처한국남부발전
지역세종
준공년도2023년 6월 예정
프로세스 및 용량

1. Water Treatment System

   1.1. Pre Treatment Sys. (Clarifier) : 200 ㎥/hr x 2 Train

   1.2. Pressure Filter : 133 ㎥/hr x 3 Train

   1.3. UF Unit : 12.2 ㎥/hr x 2 Train (생산수)

   1.4. R/O Unit (Degasifier) : 11 ㎥/hr x 2 Train (생산수)

   1.5. EDI Unit : 10 ㎥/hr x 2 Train (생산수)


2. CTBD Reclamation System

   2.1. UF Unit : 57 ㎥/hr x 2 Train

   2.2. R/O Unit : 44 ㎥/hr x 2 Train (생산수)


3. Waste Water Treatment System

   3.1. Pre Treatment Waste Water System(pH adjust) : 16 ㎥/hr x 1 Train

   3.2  Post Treatment Waste Water System (A2O + MBR) : 40 ㎥/hr x 2 Train 

   3.3. Oily Waste Water Treatment System : 3 ㎥/hr x 1 Train 


4. Sewage Water Treatment System (A2O + MBR) : 150 ㎥/day